Blog/

DUC well inventory explained: reading the count by basin

Open grassland basin stretching to the horizon under a West Texas sunset sky.

A DUC is a well that's been drilled to total depth but hasn't been completed. No perforations, no frac, no flowback. It sits there as a hole in the ground with casing set, waiting on a crew, a pipeline tie-in, or just a better strip price. The term gets thrown around loosely, so it's worth being precise: a DUC is inventory, not activity. It's a well that was drilled, and a signal about what might get completed next.

The EIA's Drilling Productivity Report is where most analysts first see the number. It breaks DUC inventory out by basin, Permian, Bakken, Eagle Ford, Anadarko, Niobrara, Appalachia, and tracks the monthly change: spuds added to the pile, completions subtracted from it. When the DUC count falls, that usually means completion crews are working through backlog faster than rigs are drilling new holes. When it climbs, rigs are running ahead of frac capacity, or operators are deliberately banking wells for a later quarter.

Why the count lags what's happening on the ground

The EIA model runs on state permit and completion filings, which show up weeks to months after the fact depending on the state. Texas RRC data has its own reporting cadence; North Dakota and New Mexico have theirs. The DPR smooths all of that into a monthly basin figure, which is useful for a quarterly view but not for catching a frac spread that mobilized three weeks ago. If you're trying to model near-term completions activity, by the time a DUC drawdown shows up in the published number, the crews that caused it have often already moved to the next pad.

This matters more in basins where private operators dominate. Public E&Ps disclose completion guidance on earnings calls, which gives you a rough read before the government data catches up. Privates don't, and in the Permian and parts of the Anadarko they're a meaningful share of the DUC pool. So the published basin number is really a blend: public operator disclosures that lead the data, and private activity that the DUC count is often your only lagging proxy for.

What the DUC count is good for, and what it isn't

Used right, DUC inventory is a directional tool. Falling DUC counts in a basin alongside flat rig counts tells you completions are running hot relative to drilling, which usually means frac crew demand is up and well costs are about to lean more on completion than drilling capital. Rising DUC counts alongside falling rig counts can mean operators are pulling back on new drilling while still working off backlog, which is a different signal than a basin where both numbers are falling together.

What it won't tell you is which pads are active right now, or whether a specific lease block is seeing rigs move in this week versus last quarter. The DUC figure is a basin-wide stock number built from filing data with an inherent lag. It's not built to answer "how many frac spreads are running in the Delaware this month," because by construction it's counting wells that haven't been completed yet, not the crews doing the completing.

That gap, between a monthly stock number from filings and what's physically staged on pads right now, is the reason a lot of analysts end up cross-checking the DUC trend against something closer to real time. A running pad, rig and frac spread count built off satellite passes for a named basin fills that specific hole: it won't tell you a well's DUC status, but it will tell you whether activity in that basin ticked up or down this month, independent of when the state files the paperwork. Tracking a basin that way is the whole idea behind a running count of pads, rigs and frac spreads built for comparing against your own completions forecast month over month.

If you're trying to square the EIA's DUC trend against what's actually showing up on the ground in a given basin, that's the kind of cross-check worth setting up before next quarter's numbers come out.

Get started