Blog

Notes from the count

  1. Field notes: the pad that cleared land twice and never spudded

    A cleared pad that sat empty, got recleared, and still never spudded. What that pattern says about reading permits versus reading the ground.

  2. How to tell a multi-well pad from a single-well pad in satellite imagery

    A field guide to reading pad footprint, equipment count and rig-move patterns in satellite passes to separate single-well pads from cube development.

  3. DJ Basin rig counts vs Permian: how drilling cycles differ

    DJ Basin and Permian rig counts don't cycle the same way. Here's why, and how a monthly pad-and-rig count reads the difference.

  4. What a rig move is, and why it shows up as noise in weekly rig counts

    Rig moves explain a chunk of the week-to-week wobble in published rig counts. Here's what's actually happening between spuds.

  5. EIA drilling productivity report vs. satellite rig counts, explained

    EIA's DPR models production from decline curves and lagged rig data. A satellite count tallies pads, rigs, and spreads monthly. Here's the gap between them.

  6. Field notes: the basin that quietly outgrew its own pipeline capacity

    A mid-cycle basin kept adding pads at a steady pace while differentials widened. The field-level signs showed up a year before the filings did.

  7. Pad clearing to spud: the timeline and the permit lag behind it

    What happens between a cleared pad and first spud, and why the permit filing shows up in state records weeks after the dirt work starts.

  8. Completions backlog vs. frac spread count: what the gap tells you

    How to read the spread between completions backlog and frac spread count, and what a widening DUC to completion ratio signals for a basin.

  9. Field notes: the week three basins moved in opposite directions

    A field-notes look at a week when the Permian, Bakken, and DJ Basin diverged, and why pad, rig, and frac spread counts caught it before permits did.

  10. How to tell an active drilling rig from a stacked rig in satellite imagery

    Pipe racks, pit activity, vehicle count, repeat passes: the tells that separate a stacked rig from a working rig in satellite imagery.

  11. What is a simul-frac, and why it throws off your frac spread count

    Simul-frac vs. zipper frac, and why the distinction matters when you're counting frac spreads at the basin level from imagery or public data.

  12. Horizontal rig vs vertical rig: how to tell them apart in satellite imagery

    Mast shadow length, substructure footprint, and pad layout: how to call horizontal vs vertical rig from a single overhead satellite pass.

  13. Why Baker Hughes rig count and permit data never quite match

    BHI rig counts and state permit filings measure different things. Here's why the numbers diverge and what permit-to-spud lag does to your basin model.

  14. DUC well inventory explained: reading the count by basin

    What drilled-but-uncompleted well counts measure, why the basin numbers lag, and what fills the gap between reports.

  15. Frac spread count vs rig count, explained

    What rig count tells you, what frac spread count tells you, and why the gap between them is the DUC story in any basin.

  16. Walking rig vs skid rig: telling them apart in satellite imagery

    How to read pad imagery for walking rig vs skid rig mobility, what each leaves behind on the pad, and where satellite resolution runs out.

  17. Spud to first production in the Permian: where the months go

    A breakdown of the spud-to-first-production timeline in the Permian Basin and why drilling cycle time varies so much between pads.