How to tell a multi-well pad from a single-well pad in satellite imagery

Permit filings tell you a well got staked. They don't tell you how many wells share that pad, and by the time the filing posts, the pad's already three months into drilling. If you're trying to read wells-per-pad off a satellite pass instead of waiting on state data, here's what actually separates a single-well location from a cube development pad.
Footprint size and shape
A single-well pad is small and close to square. Figure two to three acres, one cellar, one small tank battery skid tucked in a corner, a short access road. The whole site looks like it was built for one piece of equipment and nothing else.
A multi-well pad reads differently from the first look. It's elongated rather than square, often laid out in a long rectangle because the wellheads sit in a row on spaced slots. Cube development pads, the ones targeting four or more stacked and staggered intervals, can run ten to twenty acres or more. The tank battery footprint scales up too: instead of one small skid you'll see a run of separators and tanks sized for a dozen wells producing at once, not one.
Count what's sitting on the location
Footprint alone can mislead you, so count features. Look for the row of small square cellars along the pad, each one a distinct wellhead. A single-well pad has exactly one. A cube pad will show four, six, eight, sometimes more in a line or staggered double row, the signature of a true cube layout rather than a simple multi-well pad with two or three wells drilled from one location.
Check the tank battery and produced-water infrastructure against the cellar count. A pad with eight wellheads and a tank battery sized for one well is a flag that something's off in your read, maybe a phased drilling program, or an older pad re-drilled later. The two counts should roughly track each other on a pad built in one program.
Watch what happens over the following months
This is the part a single pass can't give you, which is exactly why cadence matters more than resolution here. A single-well pad shows one rig mobilization, one completion spread moving in for a few weeks, then quiet. Next pass, the rig's gone, the frac spread's gone, and what's left is a wellhead and a tank battery sitting still.
A cube pad shows the rig walking the same footprint for months, not weeks. You'll see the rig substructure shift position slot to slot across two, three, sometimes four consecutive monthly passes before it finally leaves. Then, instead of a small completion crew, you get a frac spread sized for a zipper job: more sand transport trucks staged nearby, a longer line of pump units, bigger water storage footprint, because the operator's completing several wells close together instead of one at a time. That equipment footprint persisting on one pad across multiple passes is the single most reliable multi-well tell available from imagery alone, more reliable than footprint size by itself.
Where this gets uncertain
You won't always get a clean cellar count. Pads under active drilling can have rig substructure covering one or more wellhead locations, so a mid-drilling pass might undercount. Older pads that got infill-drilled years after the original wells can also throw off the footprint-to-count ratio, since the tank battery was sized for the first phase, not the pad as it sits now. None of that breaks the method, it just means a single pass is a snapshot and a run of monthly passes over the same acreage is what lets you call pad type with confidence.
That's the whole case for tracking a basin on a monthly cadence instead of a one-off look: the pattern across passes tells you more than any single image does. Drilling Activity builds that running pad and rig count for a named basin, pass after pass, so the wells-per-pad read holds up over time instead of resting on one lucky image.
If you're staring at a permit lag and need a pad count that doesn't wait for the filing, that's the gap this fills.